You don't have javascript enabled. Good luck with that.
Pencarian
Kondisi saluran air baru di Gang Sabar setelah pengerjaan selesai

Channel Built in Gang Sabar to Effectively Prevent Flooding

Residents appreciate the new water channel construction in Gang Sabar, RW 04, Jagakarsa Sub-district, South Jakarta.

This is an effective step in dealing with floods

One of the residents, Ahmad Rizal, expressed his thanks and appreciation for the construction of the new channel to address flooding.

"This is an effective step in dealing with floods," he expressed, Monday (10/6).

Revitalization of Water Channel on Jalan Kramat Almost Complete

South Jakarta Water Resources Sub-agency (SDA)'s Development Section Head, Horas Yosua stated, there are two channel sizes with a length of 480 meters built since July 2024. They are 370 meters using U-ditch 40 HD and 110 meters with U-ditch 60 HD.

"Hope the construction can be completed soon. And the locals will take care of this channel by not littering randomly," he hoped.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1399 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye866 personAldi Geri Lumban Tobing
  4. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye731 personTiyo Surya Sakti
  5. One-Year Reflection: Pram-Rano Outline Performance Achievements

    access_time21-02-2026 remove_red_eye649 personDessy Suciati